Writing a daily log

Record what happened on site — notes, weather, crew, progress, and photos — before you leave for the day.

What a daily log is for

A daily log is the record of what actually happened on the job that day. It is what you reach for when a client asks why a week slipped, or when a delay claim turns up months later. Two minutes at the end of the day is the whole cost.

  • What got done, and what did not
  • Who was on site
  • Weather or conditions that cost time
  • Photos of progress, or of a problem

Writing one from the site

  1. Open the app and pick the job.
  2. Start a daily log.
  3. Write what happened in plain words.
  4. Attach any photos you took.
  5. Save it.

This works with no signal. The log and its photos are held on the phone and sync when you are back in range.

Photos carry the log

A photo of the framing beats a paragraph about the framing. Take the shot while the work is still open and add it to the log the same day — once the drywall is up, nobody can prove what went in behind it. Three lines and two photos, written at the truck, is worth more than a careful write-up nobody gets around to on Friday.

Photos sync the same way the log does, so you can take them with no signal. On a long day with a lot of pictures, give the phone a few minutes on a real connection before you close the app.

Finding logs later

  1. On the web, click Documents.
  2. Click the Daily logs filter.
  3. Click a log to open it.

Logs are filed against the job, alongside plans, permits, and contracts. Workers see the documents for the jobs they are assigned to; owners see everything.

Filing one from the office

  1. Click Documents, then Upload.
  2. Choose the file, or drag it onto the box.
  3. Name it, and set the type to Daily logs.
  4. Pick the job it belongs to.
  5. Click Upload.

Use this for logs that came in on paper or by text, so the job history stays in one place.